Mrinalini
Architects
মৃণালিনী
  1. Home
  2. Blog
  3. Guides

Architect fees in Kolkata in 2026: percentage, per sq ft and scope

The completed G+4 apartment building at New Alipore, with wood-toned fins on the street front
The Opulence at New Alipore: a G+4 building on a 3,226 sq ft plot, designed by the studio. Photograph: The Opulence, New Alipore, Kolkata, by the studio.

The short answer

Architect fees are a percentage of the cost of the works. The Council of Architecture scale lists 7.5% for an individual house, which is about ₹150 to ₹203 per sq ft at 2026 Kolkata build rates of ₹1,995 to ₹2,706. About 45% of the fee falls due by the tender-document stage.

An architect’s fee in Kolkata is a percentage of the cost of the works, not a rate per sq ft. The Council of Architecture (CoA) scale, as published, lists 7.5% for an individual house. At 2026 build rates of ₹1,995 to ₹2,706 per sq ft, that works out to about ₹150 to ₹203 per sq ft of built-up area for the full service.

What is the CoA scale of charges?

The CoA scale of charges is the fee table that the Council of Architecture, the statutory body for architects in India, prescribes for registered architects. The Architects (Professional Conduct) Regulations, 1989 direct a registered architect to inform the client of the conditions of engagement and scale of charges, and to observe and uphold them.

The regulations also stop architects from advertising their services. That is why a studio’s website can explain how fees work but cannot offer a quote or a discount.

Rates change when the Council revises its documents. The table below is taken from a published reproduction of the revised scale, accessed on 13 November 2026. Confirm the current figures on coa.gov.in before signing an appointment.

Type of work Fee as a percentage of the cost of works
Individual or independent house 7.5%
Single-block housing, sites up to 0.5 hectare 5.0%
Housing sites above 0.5 and up to 2.5 hectares 3.5%
All projects other than housing 5.0%
Conservation, retrofitting, additions, alterations 7.5%
Interior architecture 7.5%
Landscape architecture 7.5%
Verification and certification of contractor’s bills 1.0% in addition
Documentation and communication charges 10% of the professional fee

The same reproduction lists advisory consultancy at ₹4,000 a day for a local project and ₹10,000 a day for an outstation project. These per-day figures come from an older document, so treat them as a reference point.

How much is the architect fee per sq ft in Kolkata?

At 7.5%, the fee is about ₹150 to ₹203 per sq ft of built-up area. This is arithmetic, not a market quote: 7.5% applied to the ₹1,995 to ₹2,706 per sq ft that InfraLens lists as the standard-finish band for Kolkata in its 24 October 2026 update.

Build costs differ by finish. The same source puts basic finish at ₹1,339 to ₹1,995 and premium finish at ₹2,704 to ₹3,792 per sq ft. The fee follows the cost of the works, so a premium house carries a larger fee than a basic one of the same size. The full cost ranges are in the post on house construction cost per sq ft in Kolkata.

One more point on the base. The scale computes the fee on the cost of works as built, not on a guess made on day one. Early payments use the rough or preliminary estimate, and later payments use the accepted tender cost.

What does a worked example look like for a G+2 house?

Take a G+2 house on a 3 cottah plot (about 2,160 sq ft). Assume 4,200 sq ft of built-up area over three floors, which is an assumption made for this example, not a sanctioned plan. At ₹1,995 to ₹2,706 per sq ft, the cost of works is about ₹84 lakh to ₹1.14 crore.

Three-storey residence at Chakgaria standing behind its trees
The studio's three-storey house at Chakgaria, the same scale as the G+2 example in this section. Photograph: Residence, Chakgaria, Kolkata, by the studio.

At 7.5%, the full fee is about ₹6.3 lakh to ₹8.5 lakh. Taxes are extra as applicable. The next section shows how that fee is released over the project.

How is the architect’s fee paid, stage by stage?

The fee is paid in stages as the work progresses. A published reproduction of the CoA schedule of payment shows these cumulative percentages of the total fee:

Drawing of the first and fourth floor plans of the New Alipore apartment building
First and fourth floor plans for The Opulence: drawings like these are what the design stages of an appointment produce. Drawing: The Opulence, New Alipore, Kolkata, by the studio.
Stage Work done Cumulative share of fee
1 Appointment and signing of agreement ₹20,000 or 5% of the fee
2 Concept design and rough estimate 10%
3 Preliminary scheme and estimate 20%
4 Drawings for client and statutory approvals 35%
5 Working drawings, specifications, schedule of quantities and tender documents 45%
6 Inviting and analysing tenders, advising on contractor 55%
7 Construction, from commencement to virtual completion 65% to 90%
8 Completion report and drawings 100%

Other practitioners reproduce the stages differently. Studio Matrx lists cumulative figures of 10%, 20%, 35% and 60% for the first four stages of a seven-stage framework. Sources agree on the order of work but not on every percentage, so ask for the stage table in writing.

Is design-only cheaper than design plus supervision?

Design-only is cheaper because it stops at about stage 5. On the schedule above, that is 45% of the total fee. For the worked example, that is about ₹2.8 lakh to ₹3.8 lakh of the ₹6.3 lakh to ₹8.5 lakh total.

Stopping at design means the owner, or another professional, runs the contractor appointment and the site. The drawings carry the studio’s name, but nobody from the studio checks that the building matches them. Municipal rules expect the architect or Licensed Building Surveyor to plan, design and supervise the work. The West Bengal Municipal (Building) Rules, 2007 say so in rule 14, so it is worth agreeing who does the supervising before the drawings are finished.

A middle option is design plus periodic visits at fixed stages, such as footing, first slab and plaster. The checks that matter on each visit are in the site supervision checklist for house construction. The studio’s site supervision and project management page describes how that service is organised.

What changes the architect’s fee in Kolkata?

Five things move the number:

  1. Type of work. A new house, an alteration and a heritage conservation job each have their own line in the scale.
  2. Cost of works. A higher finish raises the base on which the percentage is computed.
  3. Scope. Interior design, landscape and structural coordination may sit inside or outside the appointment. Write down which.
  4. Approvals. Sanction drawings and liaison with the authority are a stage of the work, but the municipal sanction fee itself is paid to the authority and is separate.
  5. Site stages. Visit frequency and bill checking change the effort across the build months.

Grihashakti, a home finance lender, puts architectural and engineering fees at around 10% of the total in a Kolkata house budget and approvals at roughly 2% to 5%. That figure covers the structural engineer as well, so it is not a direct comparison with the architect’s 7.5%.

How much does an architect charge for house renovation in Kolkata?

The CoA scale lists 7.5% of the cost of works for additions and alterations, the same as for a new house. On small repair jobs, a percentage can be too small to cover the survey and drawing effort, so many renovations are agreed as a lump sum after a site visit.

Living room of the Budlapara bungalow with planter chairs and a red oxide floor
The living room of a 96-year-old tea bungalow the studio conserved and adapted, where the work was planned room by room. Photograph: Budlapara Tea Retreat, Udalguri district, Assam, by the studio.

If the building is old, ask whether the appointment includes a measured survey, a structural opinion and any permission needed for graded heritage buildings. The studio’s heritage conservation page covers that type of work. For interior-only jobs, see interior design.

What should be in the appointment letter?

Ask for these items in writing before paying the first instalment:

  1. The scope of services by stage, matching the stage table above.
  2. The fee as a percentage or a lump sum, with the base on which it is computed.
  3. Which approvals and drawings are included, and which are extra.
  4. How many site visits are included, and the rate for extra visits.
  5. How bills will be verified, and whether the 1% listed for certifying contractor’s bills applies.
  6. What happens if the project is paused or the scope changes.

What to do next

If you have a plot or an existing house and want to understand the fee basis for your job, write through the contact page with the plot size, location and the stage you are at. The architecture service page sets out what the studio does at each stage.

Questions people ask

How much does an architect charge per sq ft in Kolkata?

Architects rarely quote per sq ft; the Council of Architecture scale is a percentage. Converting 7.5% of a 2026 build rate of ₹1,995 to ₹2,706 gives roughly ₹150 to ₹203 per sq ft of built-up area, for the full service.

What is the architect fee as a percentage of construction cost?

The scale reproduced from the Council of Architecture lists 7.5% of the cost of works for an individual house, 5% for single-block housing on sites up to 0.5 hectare, and 5% for non-housing projects. Interior and landscape work are listed at 7.5%.

What are the CoA scale of charges?

They are the Council of Architecture's conditions of engagement and scale of charges, which registered architects are directed to observe under the Architects (Professional Conduct) Regulations, 1989. Check the current document on coa.gov.in before you sign.

How much does an architect charge for house renovation?

The scale lists 7.5% of the cost of works for conservation, retrofitting, additions and alterations. Renovation fees are often agreed on a lump sum once the scope is measured on site.

Is design-only cheaper than design plus supervision?

Yes. In the published schedule of payment, 45% of the total fee falls due by the working drawings and tender documents. The remaining 55% covers appointing the contractor, site stages and completion.

Do architects charge for site visits separately?

Under the scale, site stages are part of the percentage fee. Verification and certification of the contractor's bills is listed at 1% in addition, and advisory visits are listed at ₹4,000 a day locally.

Sources

  1. Architects (Professional Conduct) Regulations, 1989, Council of Architecture. Accessed 2026-11-13.
  2. CoA scale of charges (reproduction of the Council's scale), An Architect Explains. Accessed 2026-11-13.
  3. CoA schedule of payment (reproduction), An Architect Explains. Accessed 2026-11-13.
  4. House Construction Cost in Kolkata 2026, InfraLens. Accessed 2026-11-13.
  5. The Architect's Scope of Services in India: COA Conditions of Engagement, Studio Matrx. Accessed 2026-11-13.

Rules, fees and costs change. Figures are as published on the dates shown; check the current circular with the authority before you rely on them. This page is general information, not legal or financial advice.

Read next

  • Architect vs civil engineer vs contractor: who do you need for a house?

    An architect plans and designs the building, a structural engineer designs the frame, and a contractor builds it. In West Bengal municipalities the rules require a technical person of at least Licensed Building Surveyor rank for houses below 11.5 m, and a structural engineer above that. A contractor alone cannot sign the plan.

    Guides,
  • Building a house in Kolkata while living abroad: POA, approvals, payments

    An NRI or OCI may buy non-agricultural property in India under RBI's Master Direction, and may be represented by an attorney under a power of attorney executed before a notary, magistrate or Indian consul and then stamped in West Bengal. Building authorities accept an authorised representative as applicant. Pay by stage against measured work.

    Guides,
  • Construction cost per sq ft in Kolkata, 2026: basic, standard, premium

    In 2026 a house in Kolkata is priced at about ₹1,339 to ₹1,995 per sq ft for basic finish, ₹1,995 to ₹2,706 for standard and ₹2,704 to ₹3,792 for premium, per InfraLens. A lender's guide gives ₹1,800 to ₹2,600. Soil and foundation can move the figure by ₹300 to ₹500.

    Guides,
  • How to choose an architect in Kolkata: CoA check, portfolio, scope, fees

    Choose an architect by checking the Council of Architecture registration number on coa.gov.in, looking at completed work and not only renders, agreeing scope by stage, cross-checking the fee against the CoA scale, and signing a written appointment letter. Under the Architects Act, 1972 only a registered architect may use the title.

    Guides,

All articlesMore in guides