Guides to building in Kolkata, West Bengal and Assam

What it costs, which approvals you need, how a building is supervised, and the styles, materials and old buildings of eastern India. Written by the studio from its own work, with sources for every rule and figure.

Guides

All guides

Costs, fees, approvals and the order of work, written for people about to build in Kolkata, West Bengal and Assam.

  • 3 cottah house plan in Kolkata: what G+2 and G+3 can you build?

    One cottah is about 720 sq ft, so a 3 cottah plot is about 2,160 sq ft. Under the WB Municipal (Building) Rules, 2007, ground coverage is 65% up to 200 sq m, so a G+2 house can reach about 4,200 sq ft. KMC and NKDA apply their own rules, so the road width and the authority decide.

    Guides,
  • Architect fees in Kolkata in 2026: percentage, per sq ft and scope

    Architect fees are a percentage of the cost of the works. The Council of Architecture scale lists 7.5% for an individual house, which is about ₹150 to ₹203 per sq ft at 2026 Kolkata build rates of ₹1,995 to ₹2,706. About 45% of the fee falls due by the tender-document stage.

    Guides,
  • Architect vs civil engineer vs contractor: who do you need for a house?

    An architect plans and designs the building, a structural engineer designs the frame, and a contractor builds it. In West Bengal municipalities the rules require a technical person of at least Licensed Building Surveyor rank for houses below 11.5 m, and a structural engineer above that. A contractor alone cannot sign the plan.

    Guides,
  • BOQ for house construction: format, rate analysis and comparing quotes

    A bill of quantities (BOQ) is a priced list of every item of work with its unit, quantity, rate and amount, so each contractor quotes the same scope. The Government of India's works manual pays item rate contracts on measured quantity, usually within 15% of the BOQ quantity per item.

    Guides,
  • Building a house in Kolkata while living abroad: POA, approvals, payments

    An NRI or OCI may buy non-agricultural property in India under RBI's Master Direction, and may be represented by an attorney under a power of attorney executed before a notary, magistrate or Indian consul and then stamped in West Bengal. Building authorities accept an authorised representative as applicant. Pay by stage against measured work.

    Guides,
  • Building permission in Guwahati: GMDA, GMC, Assam OBPS and seismic zone V

    In Guwahati the Guwahati Metropolitan Development Authority issues the planning permit and Guwahati Municipal Corporation the building permit, under the Assam Unified Building Construction (Regulation) Byelaws, 2022 and its amendments. The byelaws allow 30 days for the planning permit and 45 for the building permit. Residential buildings up to G+2 on plots up to 670 sq m can get an instant permit.

    Guides,
  • Building plan approval in Siliguri: SJDA clearance and SMC sanction

    Siliguri needs two approvals. SJDA issues the Land Use Compatibility Certificate with a sanctioned site plan, valid one year, and Siliguri Municipal Corporation then sanctions the building plan under the West Bengal Municipal (Building) Rules, 2007, which set a 60-day limit. A sanction lasts three years and can be renewed for two.

    Guides,
  • Building plan approval in West Bengal: municipality and panchayat

    In a West Bengal municipality, an empanelled architect or LBS applies on the state OBPAS (e-Grihanaksha) under the WB Municipal (Building) Rules, 2007, which allow 60 days for a decision. In a gram panchayat area, the owner applies on the P&RD portal, and a Pradhan, Panchayat Samiti or Zilla Parishad officer grants permission by building size.

    Guides,
  • Completion and occupancy certificate in Kolkata: who issues it and how

    In Kolkata Municipal Corporation limits the permission to occupy is called the Completion Certificate. Other West Bengal municipalities and NKDA call it the Occupancy Certificate. Each needs a notice within one month of completion, an inspection within 15 days, and a structural stability certificate signed by the engineer.

    Guides,
  • Construction cost per sq ft in Kolkata, 2026: basic, standard, premium

    In 2026 a house in Kolkata is priced at about ₹1,339 to ₹1,995 per sq ft for basic finish, ₹1,995 to ₹2,706 for standard and ₹2,704 to ₹3,792 for premium, per InfraLens. A lender's guide gives ₹1,800 to ₹2,600. Soil and foundation can move the figure by ₹300 to ₹500.

    Guides,
  • FAR and setback rules in Kolkata: what you can build on your plot

    Under the KMC Building Rules, 2009 the FAR for a residential plot in Kolkata depends on the width of the road in front: 1.25 on a road of 2.4 to 3.5 m, 1.75 on 3.5 to 7 m, 2.25 on 9 to 15 m. Ground coverage is 60 per cent up to 200 sq m, and the height and setbacks also follow the road width and height.

    Guides,
  • Flat interior cost in Kolkata in 2026: 2BHK and 3BHK budgets per sq ft

    Published 2026 figures for a 2BHK in Kolkata run from ₹6 to ₹14 lakh (₹700 to ₹1,600 per sq ft) at DesignCafe to ₹1,500 to ₹3,000 per sq ft at Livspace. A 3BHK is quoted at ₹7 to ₹15 lakh or more. Kitchen and wardrobes take about half the budget, and civil work, appliances and loose furniture are usually extra.

    Guides,
  • How to choose an architect in Kolkata: CoA check, portfolio, scope, fees

    Choose an architect by checking the Council of Architecture registration number on coa.gov.in, looking at completed work and not only renders, agreeing scope by stage, cross-checking the fee against the CoA scale, and signing a written appointment letter. Under the Architects Act, 1972 only a registered architect may use the title.

    Guides,
  • KMC building plan sanction in Kolkata: online steps, documents, timeline

    A plot owner in Kolkata engages a KMC-empanelled architect or Licensed Building Surveyor, who files the plan online under the KMC Act, 1980 and the KMC Building Rules, 2009. Reported timelines range from 15 to 30 days for the fast track and 45 to 90 days from one vendor.

    Guides,
  • NKDA building plan approval in New Town: rules, documents, steps

    In New Town, the plan is sanctioned by NKDA under its Building Rules, 2009, applied for online through OBPAS by an enlisted architect and engineer. The rules allow 60 days from a complete application, 65% ground coverage on plots up to 3 cottah, and a maximum FAR of 2.5 for residential plots below 1,500 sq m.

    Guides,
  • Old house renovation in Kolkata: what needs KMC sanction and what it costs

    Under rule 3(2) of the KMC Building Rules, 2009, repairs such as painting, plastering, reflooring, plumbing and internal partitions need no building permit, though some need 15 days' notice. Removing a wall, column or beam, adding area or height, or changing use is alteration and needs sanction. Vendor renovation rates in Kolkata run from ₹1,300 to ₹3,500 per sq ft.

    Guides,
  • Project management consultant for building construction: PMC explained

    A PMC is an independent professional or firm appointed to manage a project's delivery on the owner's behalf: scheduling, tender support, quality checks, measurement and bill certification. A PMC does not design or build, and there is no fixed tariff. Fees are a percentage of project cost or a fixed sum.

    Guides,
  • Regularising unauthorised construction in West Bengal: schemes and limits

    Only minor deviations can be regularised in West Bengal. A December 2023 notification defines minor as up to 5 per cent on internal dimensions or covered area and up to 10 per cent on height, with fees of 10 to 80 per cent of the I.G.R. value of the deviated area. Extra floors and larger breaches face demolition, and courts have warned against regularising after the fact.

    Guides,
  • Site supervision checklist for house construction: stage-wise checks

    Site supervision means checking, at fixed stages, that the building is made as drawn and specified. IS 456:2000 sets minimum curing at seven days for ordinary Portland cement and a sampling rule of one cube set per 5 cubic metres of concrete. In West Bengal the architect or LBS and the structural engineer carry duties on site.

    Guides,
  • Soil test and foundation types for a house in Kolkata's soft soil

    Kolkata's ground is soft alluvial clay, so a soil investigation under IS 1892 comes before the foundation design. One New Town report found about 16 m of soft clay with the water table at 3.5 to 4.3 m. Small houses often take isolated footings or a raft, and heavier or taller ones take piles, as the geotechnical report decides.

    Guides,
  • Turnkey vs item-rate vs labour contract for a house: risk, control, payment

    In an item-rate contract you pay unit rates for measured work, and quantities can vary by about 15 per cent per item before rates are revised. In a lump sum or turnkey contract the contractor carries quantity risk for a fixed scope and is paid by milestone. In a labour-only contract you buy the materials and carry that risk yourself.

    Guides,

Design and styles

All design and styles

House types, plans and the architecture of Bengal and Assam, and what each asks of a site.

All trends

What is changing in Indian homes, interiors and buildings, and which changes are worth following.

  • 3D visualisation in architecture: what a render shows and what it hides

    A 3D visualisation shows proportion, massing, sightlines, colour and the way rooms connect before anything is built. It does not show heat, sound, cost, structure or how materials age. Research on design review also warns that a photorealistic render can make a design look more finished than it is.

    Trends,
  • AI in architecture for Indian clients: what changes and what does not

    AI tools can produce pictures and design options quickly. They do not know your plot, the sanction rules or the structure, and no Indian rule found makes an AI tool responsible for a drawing. Under the Architects Act 1972 and the CoA conduct regulations, the registered architect answers for the work.

    Trends,
  • Biophilic design in Indian homes: what works beyond plants

    Biophilic design connects a building's users with nature through light, views, air movement, natural materials and form, not only potted plants. The Terrapin Bright Green framework lists 14 patterns. The evidence for views and daylight is stronger than for plants cleaning air, and in the monsoon every pot tray is a mosquito risk.

    Trends,
  • Compact flat planning: a 600 to 900 sq ft flat for a family of four

    Start from carpet area, since RERA defines it as the net usable floor area of the flat. In Kolkata a habitable room may be as small as 6 sq m under KMC rules, but a bedroom of about 9.5 sq m is a better floor for a family of four. Plan one open living and dining space, closed storage and a kitchen that works in a line.

    Trends,
  • Home office design for Indian flats: a small-room checklist

    A working desk top sits at 710 mm, with at least 640 mm of clearance under it, according to IS 3663. Lighting for computer work is 300 to 750 lux under IS 3646. NBC 2005 puts the acceptable indoor noise for homes and small offices at 35 to 40 dB(A). Plan sockets and daylight before the furniture.

    Trends,
  • Interior design trends 2026 in India: what works in Kolkata flats

    The 2026 trends in Indian interiors are soft, warm whites led by Pantone's Cloud Dancer, Japandi and minimalism, and compact homes planned with built-in storage. In Kolkata, where mean humidity is about 69% and peaks near 83% in August, wood, cane and plywood need sealed finishes and dry detailing to last.

    Trends,
  • Japandi interior design in an Indian flat: what suits Kolkata's humidity

    Japandi blends Japanese and Scandinavian minimalism: muted colour, natural wood, few objects. It suits a Kolkata flat in its palette, low clutter and handmade ceramics, but the wood is the risk. Timber takes up moisture in humid air, so choose sealed, well-seasoned wood, boards graded for damp, and keep closed furniture ventilated.

    Trends,
  • Multigenerational home design in India: grandparents and children

    A multigenerational home works when the grandparents' bedroom and bathroom are on the entrance level, the doors are at least 900 mm clear, the floors are not slippery when wet, and each generation has some privacy. The national accessibility guidelines give the dimensions, and they are larger than what a Kolkata sanction minimum allows.

    Trends,
  • Smart home wiring in new construction in India: what to run before plaster

    Smart devices are easy to add later only if the conduits, power points and neutral wires are already in the wall. IS 732 caps conduit fill at 40 per cent, allows no more than four quarter bends between outlets, and asks for a 30 mA RCD on socket circuits where earthing is not effective.

    Trends,
  • Terrazzo flooring in India: costs, cracks, maintenance and an honest view

    Terrazzo is marble chips in a cement or epoxy matrix, ground and polished. Published Indian rates run from about Rs 60 to 300 a sq ft for tiles and Rs 150 to 900 a sq ft installed for in-situ cement and epoxy floors, before GST. Cement terrazzo needs joints and a sealer, and acids etch it.

    Trends,
  • Tropical modern house design in India: eaves, verandahs and shading

    Tropical modern design pairs a contemporary plan with climate controls: deep eaves, verandahs, screens and openings for cross-ventilation. In Kolkata's humid climate they cut sun and rain on the walls. The Eco Niwas Samhita sets numeric limits for larger residential plots, including an openable-window ratio and a cap on heat gain through the envelope.

    Trends,

Materials and climate

All materials and climate

Damp, monsoon, heat, earthquakes and the materials that cope with eastern India.

Public and commercial

All public and commercial

Schools, colleges, hotels, banquet halls, offices and work for government and companies.

Heritage

All heritage

Restoring old buildings, the rules that protect them and how to give them a new use.

  • Adaptive reuse of old buildings in India: approvals and structural checks

    Adaptive reuse means changing an old building to suit a new use while keeping what makes it significant. The Burra Charter accepts it only where impact on significance is minimal. In Kolkata, work on graded heritage buildings goes through KMC's Heritage Conservation Committee, and structural checks follow IS 15988:2013 for concrete and IS 13935:2009 for masonry.

    Heritage,
  • Heritage building restoration in Kolkata: KMC grades and the process

    KMC grades heritage buildings I, IIA, IIB and III. Work on a graded building goes through the Environment and Heritage Department and the Heritage Conservation Committee, and Grade I proposals rest on a Mayor-in-Council resolution. Check whether your old house is graded before you plan any repair or alteration.

    Heritage,
  • Tea garden bungalow restoration and homestay conversion in Assam

    Assam allows up to 5 per cent of a tea estate's land to be used for activities such as tea tourism, and a 2026 amendment Bill would extend this to leasing. A bungalow conversion also meets homestay rules, a Ministry of Tourism classification and heritage care. The studio converted a 96-year-old bungalow at Budlapara.

    Heritage,

Project stories

All project stories

How particular buildings by the studio were planned, drawn and built.