Mrinalini
Architects
মৃণালিনী
  1. Home
  2. Work
  3. Dream Villa
DREAM VILLA

Dream Villa

Muchipara, Kolkata. Completed

Four floors of celebration, stacked on a plot of 1,138 sq ft.

The brief was a complete venue for weddings and celebrations on a plot of 1,138 sq ft in Muchipara. The site could not spread, so the studio stacked it: ground and three floors, 41 ft high, with 1,918 sq ft of built-up area.

To the street the building alternates bands of glass and wood-toned cladding, so the front reads as a measured rhythm by day. At night each floor lights up in turn, and a glass canopy covers the roof terrace. Inside, the detailing is kept fine and the lighting is planned so that each event has an atmosphere of its own.

The hall is complete and in use.

Banquet hall facade, glass and wood-tone bands
Banquet hall facade, glass and wood-tone bands

Views and clips

Camera move over a still. Not video footage. Dream Villa, tilt up the facade.
Dream Villa, glass and wood-tone bands. AI visualisation made from the studio's photographs. Not a photograph.
AI visualisation made from the studio's photographs. Not a photograph. Dream Villa, glass and wood-tone bands.

Related work

Discuss a project like Dream Villa

It comes straight to the studio’s inbox. A reply usually follows within a working day.

WhatsApp instead