Dream Villa: a G+3 banquet hall on a 1,138 sq ft plot in Muchipara

Dream Villa banquet hall in Muchipara lit at night, with each floor lit in turn
Dream Villa at night: each floor lights up in turn. Photograph: Dream Villa, Muchipara, Kolkata, by the studio.

The short answer

Dream Villa in Muchipara, Kolkata, is a banquet hall on a plot of only 1,138 sq ft. The studio stacked it over ground plus three floors, 41 ft high, with 1,918 sq ft of built-up area. Bands of glass and wood-tone cladding face the street, and a glass canopy covers the roof terrace. The hall is complete and in use.

Dream Villa in Muchipara, Kolkata, is a banquet hall built on a plot of only 1,138 sq ft. The site could not spread, so the studio stacked the hall over ground plus three floors, 41 ft high, with 1,918 sq ft of built-up area. The hall is complete and in use. This page describes how the design answers the small plot.

What is Dream Villa?

Dream Villa is a venue for weddings and celebrations at Muchipara, Kolkata. The brief was a complete venue on a plot of 1,138 sq ft. The studio’s scope was architectural design, and the project page lists the status as completed.

Entrance gate of Dream Villa with dark stone piers, a red gate and the Dream Villa sign
The entrance at street level, with the Dream Villa sign beside the gate. Photograph: Dream Villa, Muchipara, Kolkata, by the studio.

The facts, as stated on that page:

Item Figure
Use Banquet hall (commercial)
Location Muchipara, Kolkata
Land area 1,138 sq ft
Built-up area 1,918 sq ft
Height G+3, 41 ft
Scope Architectural design
Status Completed

For scale, 1,138 sq ft is a little over one and a half cottah, taking one cottah as about 720 sq ft. The studio’s guide to house plans on a cottah plot in Kolkata explains the unit.

Why stack a banquet hall?

The plot could not spread, so the building went up. Ground plus three floors gives four levels, and the built-up area of 1,918 sq ft is about 1.7 times the plot. That ratio is plain arithmetic on the two published figures. It is not the floor area ratio of the authority, and the studio’s page does not give floor-by-floor areas.

If the area were shared equally between the four floors, each would be a little under 480 sq ft. The page does not say how the floors were divided, so treat this as a sense of scale and not as the plan.

The idea carries to other cramped sites. When land is the limit, the vertical dimension is the resource, and the design effort goes into the stair, the services and the lighting that make a tall, narrow building work for guests. Banquet halls bring their own rules for exits, fire safety and occupancy, set out in the studio’s guide to banquet hall design and the fire NOC. Read it before you test a small plot, since a narrow stacked venue is judged against the same code as a large one.

How does the front of Dream Villa work?

The front alternates bands of glass and wood-toned cladding. By day it reads as a measured rhythm, with horizontal lines that make a narrow building look settled on its street. At night each floor lights up in turn, so the building announces itself without a large sign.

Dream Villa banquet hall facade in Muchipara in alternating bands of glass and wood-tone cladding
By day the front reads as a measured rhythm of glass and wood-tone bands. Photograph: Dream Villa, Muchipara, Kolkata, by the studio.

Three points about the design are visible in the project record:

  1. The bands divide a tall face into four readable floors. A single glazed wall would look like a tower, and bands keep the human scale.
  2. Glass gives light and a view of the street from the inside, and wood-toned cladding gives warmth.
  3. Lighting is part of the facade. Each floor can be lit separately, which is why the night view differs from the day view.

The studio’s guide to commercial building design discusses the facade of a commercial building more widely, including signage and heat.

What does the inside of the hall do?

Inside, the detailing is kept fine and the lighting is planned so that each event has an atmosphere of its own. The photograph on the studio’s page shows wood panelling and cove lighting. A cove is a shallow recess that hides the light source and washes the ceiling or wall with an even glow.

Interior of a Dream Villa hall with wood panelling and cove lighting
Inside, the detailing is fine and the lighting is planned so each event has its own atmosphere. Photograph: Dream Villa, Muchipara, Kolkata, by the studio.

On a small plot this matters more than on a large one. A hall of modest area cannot rely on size to impress, so surface, light and proportion do the work. Lighting that can be set for a wedding, a reception or a small family event lets a single hall serve all three. The details of the system are not on the project page, and this page does not guess at them.

What is on the roof?

A glass canopy covers the roof terrace. The studio’s photograph shows a terrace with warm wall lights at night under a roof of glass panels on a light frame.

Rooftop terrace of Dream Villa at night, under a glass canopy
The roof terrace at night, under a glass canopy. Photograph: Dream Villa, Muchipara, Kolkata, by the studio.

A covered terrace adds usable area to a small plot at the top of the building, where the view is best. A canopy keeps rain off during the monsoon, so the terrace works as an event space in more months of the year than an open roof would. As with the rest of the building, the use of the terrace is subject to the fire and safety requirements that apply to roof assemblies.

What can an owner with a small plot take from Dream Villa?

The project shows what is possible in one case. It does not set a rule for every plot, and the plot, the road and the local authority decide what can be built. Four questions are worth asking an architect at the start:

  1. What is the largest area and height the authority will sanction on this plot? Ask for the calculation in writing.
  2. How will guests and staff leave the building in an emergency, and does the staircase meet the code for a place of assembly?
  3. Where will the kitchen, the stores and the services sit, on a plot with no spare room?
  4. How should the front look by day and by night, given that the signage and lighting are part of the design?

The studio’s building plan approval service covers the sanction side, and its architecture service covers the design. The full record of this project is on the page for Dream Villa, and the companion project at New Town, built on a much larger site, is described in the guide to the column free banquet hall. To discuss a venue project, use the contact page.

Questions people ask

How big is the plot of the Dream Villa banquet hall?

The plot at Muchipara, Kolkata, is 1,138 sq ft. The building has 1,918 sq ft of built-up area over ground plus three floors, 41 ft high.

Can a banquet hall be built on a small plot in Kolkata?

Dream Villa is an example: the studio stacked the hall over four floors on a plot of 1,138 sq ft. Whether a given plot allows it depends on the plot, the road width and the approval from the authority, so check the rules before you plan.

What is the facade of Dream Villa made of?

The front alternates bands of glass and wood-toned cladding, so by day it reads as a measured rhythm. At night each floor lights up in turn.

Is the Dream Villa banquet hall finished?

Yes. The studio's project page states that the hall is complete and in use. The studio's scope was architectural design.

What is on the roof of Dream Villa?

A roof terrace, covered by a glass canopy.

Work by the studio mentioned here

Read next

  • 3 cottah house plan in Kolkata: what G+2 and G+3 can you build?

    One cottah is about 720 sq ft, so a 3 cottah plot is about 2,160 sq ft. Under the WB Municipal (Building) Rules, 2007, ground coverage is 65% up to 200 sq m, so a G+2 house can reach about 4,200 sq ft. KMC and NKDA apply their own rules, so the road width and the authority decide.

    Guides,
  • Banquet hall design: layout, exits and fire NOC in West Bengal

    A banquet hall in West Bengal is an assembly building under NBC 2016, Group D. It needs a fire NOC at any height, exit doors at least 2.0 m wide, a travel distance of 30 m to an exit (45 m if fully sprinklered) and exit width sized from the number of guests. Plan the exits and the fire clearance before the facade.

    Public and commercial,
  • Commercial building design in India: approvals, fire NOC, cost drivers

    A commercial building in West Bengal needs a sanctioned plan from the municipality and a fire NOC at any height. NBC 2016 sets at least two exits on every office floor, a 30 m travel distance and occupant loads of 10 sq m per person for offices. Plot size, height, lifts and fire systems drive cost more than finishes.

    Public and commercial,
  • Completion and occupancy certificate in Kolkata: who issues it and how

    In Kolkata Municipal Corporation limits the permission to occupy is called the Completion Certificate. Other West Bengal municipalities and NKDA call it the Occupancy Certificate. Each needs a notice within one month of completion, an inspection within 15 days, and a structural stability certificate signed by the engineer.