Mrinalini
Architects
মৃণালিনী
  1. Home
  2. Work
  3. Residence, Ballygunge Place

Residence, Ballygunge Place

Ballygunge Place, Kolkata. Ongoing, in visualisation

A family house drawn as one piece, from the façade to the reading room.

The plot at Ballygunge Place measures 1,441 sq ft, and the family asked the studio to design the house and its interiors together. The building will rise to 30 ft with 2,665 sq ft of built-up area over three floors.

A double-height living room gives the house its main volume, and everything else gathers around it: the dining room and kitchen, a reading room lined with books, and a bedroom in blue panelling. Because the architecture and the interiors are in one hand, each room is planned and furnished as a single piece of work.

The project is ongoing and is shown here in visualisation. With no exterior image yet, the house is drawn on the road as a dashed outline.

Double-height living visualisation
Visualisation. Double-height living visualisation
Ground/1st/2nd floor plans (partial crop)
Drawing: ground/1st/2nd floor plans (partial crop)

Related work

Discuss a project like Residence, Ballygunge Place

It comes straight to the studio’s inbox. A reply usually follows within a working day.

WhatsApp instead