Trends
What is changing in Indian homes, interiors and buildings, and which changes are worth following.
- 3D visualisation in architecture: what a render shows and what it hides
A 3D visualisation shows proportion, massing, sightlines, colour and the way rooms connect before anything is built. It does not show heat, sound, cost, structure or how materials age. Research on design review also warns that a photorealistic render can make a design look more finished than it is.
Trends, - AI in architecture for Indian clients: what changes and what does not
AI tools can produce pictures and design options quickly. They do not know your plot, the sanction rules or the structure, and no Indian rule found makes an AI tool responsible for a drawing. Under the Architects Act 1972 and the CoA conduct regulations, the registered architect answers for the work.
Trends, - Biophilic design in Indian homes: what works beyond plants
Biophilic design connects a building's users with nature through light, views, air movement, natural materials and form, not only potted plants. The Terrapin Bright Green framework lists 14 patterns. The evidence for views and daylight is stronger than for plants cleaning air, and in the monsoon every pot tray is a mosquito risk.
Trends, - Compact flat planning: a 600 to 900 sq ft flat for a family of four
Start from carpet area, since RERA defines it as the net usable floor area of the flat. In Kolkata a habitable room may be as small as 6 sq m under KMC rules, but a bedroom of about 9.5 sq m is a better floor for a family of four. Plan one open living and dining space, closed storage and a kitchen that works in a line.
Trends, - Home office design for Indian flats: a small-room checklist
A working desk top sits at 710 mm, with at least 640 mm of clearance under it, according to IS 3663. Lighting for computer work is 300 to 750 lux under IS 3646. NBC 2005 puts the acceptable indoor noise for homes and small offices at 35 to 40 dB(A). Plan sockets and daylight before the furniture.
Trends, - Interior design trends 2026 in India: what works in Kolkata flats
The 2026 trends in Indian interiors are soft, warm whites led by Pantone's Cloud Dancer, Japandi and minimalism, and compact homes planned with built-in storage. In Kolkata, where mean humidity is about 69% and peaks near 83% in August, wood, cane and plywood need sealed finishes and dry detailing to last.
Trends, - Japandi interior design in an Indian flat: what suits Kolkata's humidity
Japandi blends Japanese and Scandinavian minimalism: muted colour, natural wood, few objects. It suits a Kolkata flat in its palette, low clutter and handmade ceramics, but the wood is the risk. Timber takes up moisture in humid air, so choose sealed, well-seasoned wood, boards graded for damp, and keep closed furniture ventilated.
Trends, - Multigenerational home design in India: grandparents and children
A multigenerational home works when the grandparents' bedroom and bathroom are on the entrance level, the doors are at least 900 mm clear, the floors are not slippery when wet, and each generation has some privacy. The national accessibility guidelines give the dimensions, and they are larger than what a Kolkata sanction minimum allows.
Trends, - Smart home wiring in new construction in India: what to run before plaster
Smart devices are easy to add later only if the conduits, power points and neutral wires are already in the wall. IS 732 caps conduit fill at 40 per cent, allows no more than four quarter bends between outlets, and asks for a 30 mA RCD on socket circuits where earthing is not effective.
Trends, - Terrazzo flooring in India: costs, cracks, maintenance and an honest view
Terrazzo is marble chips in a cement or epoxy matrix, ground and polished. Published Indian rates run from about Rs 60 to 300 a sq ft for tiles and Rs 150 to 900 a sq ft installed for in-situ cement and epoxy floors, before GST. Cement terrazzo needs joints and a sealer, and acids etch it.
Trends, - Tropical modern house design in India: eaves, verandahs and shading
Tropical modern design pairs a contemporary plan with climate controls: deep eaves, verandahs, screens and openings for cross-ventilation. In Kolkata's humid climate they cut sun and rain on the walls. The Eco Niwas Samhita sets numeric limits for larger residential plots, including an openable-window ratio and a cap on heat gain through the envelope.
Trends,