Mrinalini
Architects
মৃণালিনী
  1. Home
  2. Blog
  3. Materials and climate

Cool roofs and the Eco Niwas Samhita: what the energy code asks of homes

Residence at Chakgaria, Kolkata, with deep slab edges and timber grilles among trees
The Chakgaria residence: deep slab edges shade the rooms and timber grilles filter the light. Photograph: Residence, Chakgaria, Kolkata, by the studio.

The short answer

ENS 2024 sets a roof U-value of at most 1.2 W/m2K and a RETV of at most 15 W/m2 for warm-humid places such as Kolkata. It applies from 100 kW of connected load or 120 kVA of demand, so most single homes fall outside it. Its cool-roof annexure is advisory and gives a reflectance of 0.6.

The Eco Niwas Samhita 2024 sets a roof U-value of at most 1.2 W/m2K and an envelope value (RETV) of at most 15 W/m2 for warm-humid places such as Kolkata. It applies from 100 kW of connected load or 120 kVA of demand, so most single homes fall outside it. Its cool-roof annexure is advisory.

What is the Eco Niwas Samhita?

The Eco Niwas Samhita, or ENS, is the residential energy code of the Bureau of Energy Efficiency (BEE), under the Ministry of Power. The 2024 edition is a consolidated code. It merges the earlier Part 1 on the envelope and Part 2 on electro-mechanical systems, and adds site, water, waste and indoor air quality.

Earlier editions are still quoted online, and they differ. The ECBC portal page for ENS 2018 describes a 500 sq m plot trigger. That trigger belongs to the older code and is not the 2024 test.

Does it apply to a house?

Clause 2.2 of ENS 2024 applies the code to residential buildings with a minimum connected load of 100 kW or a contract demand of 120 kVA. A footnote adds a plot area of 3,000 sq m, whichever is more stringent, and says states and municipal bodies may change the plot trigger. A single family house is usually well below these loads. A large apartment complex may not be.

The code has three compliance levels in clause 2.8. ENS is the mandatory level. ENS+ and Super ENS are voluntary. A project can show compliance with software or a toolkit approved by the BEE.

This post found no notification of ENS for homes in West Bengal, so its status here is unconfirmed. Ask the municipality whether it applies to your project.

What does ENS ask of a roof and a wall in Kolkata?

ENS 2024 sorts places into climate zones. Annexure 2 classes Kolkata as warm-humid. For that zone:

Item ENS 2024 Clause
Roof U-value At most 1.2 W/m2K 5.2.1.3
Envelope (RETV), walls and windows At most 15 W/m2 5.2.1.4
Planned RETV improvement 12 W/m2 Footnote 10
Openable window to floor area At least 16.66 per cent Table 8

The roof U-value is the rate at which heat passes through the roof, so a lower number means a better roof. The code gives extra points for going well beyond the limit: a roof U-value below 0.28 earns the full 4 points, and a RETV under 6 earns 36 points.

The window figure of 16.66 per cent is one-sixth, adapted from the National Building Code. The guide to cross-ventilation in Kolkata apartments explains what it means in a plan.

What does a cool roof do, and what does the code say about it?

A cool roof is a roof with a top layer that has high solar reflectance and high thermal emittance, so that it absorbs less of the sun’s heat and sends more of it back. ENS 2024 treats it in Annexure 8, and it says that cool roofs are not to be seen as an alternative to the roof U-value requirement. They sit on top of it.

Visualisation of the Mukundapur apartment building with a timber pergola shading the roof terrace
The Mukundapur apartments in visualisation: a timber pergola shades the roof terrace. Visualisation: Apartments, Mukundapur, Kolkata, by the studio.

The reflectance figures differ between sources:

Source Initial solar reflectance Initial emittance Note
ENS 2024 Annexure 8, citing ECBC 2017 At least 0.6 0.9 Roofs with slopes under 20 degrees; recommendation
Centre for Science and Environment At least 0.70 At least 0.75 Attributed to the commercial code of 2024
ENS 2018, ECBC portal 0.6 Not stated Older edition

Use the ENS Annexure 8 figure for a home and confirm it with the BEE. The Annexure also notes that the Indian Green Building Council’s Green Homes system asks for a Solar Reflectance Index of 78 on roofs of slope up to 1:6. Roof insulation and reflective coatings are different jobs, and the code values the U-value first.

Telangana has gone further. Its Cool Roof Policy 2023 to 2028 took effect on 1 April 2023 and is mandatory for residential plots of 600 sq yd and above and for all government, non-residential and commercial buildings, and optional for smaller plots. No such policy was found for Kolkata or West Bengal.

What about shade and glass?

Roofs are one part of the envelope. Walls and windows count in the RETV. ENS 2024 sets a minimum visible light transmittance for glazing by window-to-wall ratio, from 0.27 up to a ratio of 0.30 down to 0.11 at 0.61 to 0.70. It sets no stand-alone limit on solar heat gain; the effect enters through the RETV formula, including a shading factor. The result depends on the inputs, so a calculation by an architect or energy consultant is worth having.

Shade is a design response before it is a code response. At the Chakgaria residence, deep slab edges shade the rooms and timber grilles filter the light, in the studio’s description. At the Mukundapur apartments, shown in visualisation, a timber pergola shades the roof terrace. The guide to tropical modern house design covers these moves.

Is solar power required?

KMC Building Rules, 2009, rule 147 requires solar water heating and solar power in new buildings above 15.5 m. It does not mention cool roofs.

What should an owner do?

Ask three questions at the design stage:

  1. Does ENS apply to this building through load, plot area or a local rule?
  2. If it does, what are the roof U-value, the RETV and the window ratio on the drawings, and who will calculate them?
  3. If it does not, which of its measures are worth taking anyway: roof insulation, shade, and a reflective finish?

The studio’s architecture service covers the design side. For a rating on top of the code, read the guide to IGBC and GRIHA ratings. To discuss a house or a block, use the contact page.

Questions people ask

What is the Eco Niwas Samhita?

It is the Energy Conservation Building Code for residential buildings, issued by the Bureau of Energy Efficiency. The 2024 edition is a consolidated code that merges the earlier envelope and electro-mechanical parts and adds site, water, waste and indoor air quality.

Does ENS 2024 apply to my house?

Clause 2.2 applies it to residential buildings with a connected load of 100 kW or a contract demand of 120 kVA. A footnote adds a plot area of 3,000 sq m, whichever is more stringent. States and municipalities may change the trigger, so ask your local body.

What roof U-value does ENS 2024 ask for?

Clause 5.2.1.3 says the roof shall comply with a maximum U-value of 1.2 W/m2K. That is the number for all climate zones in the sources read for this post.

What is RETV?

RETV is the Residential Envelope Transmittance Value, a measure of heat gain through the walls and windows of a dwelling. ENS 2024 sets a maximum of 15 W/m2 for the warm-humid zone, which includes Kolkata, and says the Bureau plans to improve it to 12.

What reflectance does a cool roof need?

Sources disagree. ENS 2024 Annexure 8 cites the ECBC 2017 values of initial solar reflectance at least 0.6 and emittance 0.9, as a recommendation. The Centre for Science and Environment quotes 0.70 and 0.75, attributed to the commercial code of 2024. Do not treat 0.70 and 0.75 as an ENS rule.

Work by the studio mentioned here

Sources

  1. Eco-Niwas Samhita 2024, Energy Conservation and Sustainable Building Code for residential buildings, Bureau of Energy Efficiency, Ministry of Power. Accessed 2026-11-13.
  2. Eco Niwas Samhita (ENS) 2018, Bureau of Energy Efficiency, ECBC portal. Accessed 2026-11-13.
  3. Report on the Energy Conservation and Sustainable Building Code 2024, Centre for Science and Environment. Accessed 2026-11-13.
  4. India's first cool roof policy launched in Telangana, Telangana Today. Accessed 2026-11-13.
  5. Kolkata Municipal Corporation Building Rules, 2009, rule 147, Kolkata Municipal Corporation. Accessed 2026-11-13.

Rules, fees and costs change. Figures are as published on the dates shown; check the current circular with the authority before you rely on them. This page is general information, not legal or financial advice.

Read next

  • Tropical modern house design in India: eaves, verandahs and shading

    Tropical modern design pairs a contemporary plan with climate controls: deep eaves, verandahs, screens and openings for cross-ventilation. In Kolkata's humid climate they cut sun and rain on the walls. The Eco Niwas Samhita sets numeric limits for larger residential plots, including an openable-window ratio and a cap on heat gain through the envelope.

    Trends,
  • Biophilic design in Indian homes: what works beyond plants

    Biophilic design connects a building's users with nature through light, views, air movement, natural materials and form, not only potted plants. The Terrapin Bright Green framework lists 14 patterns. The evidence for views and daylight is stronger than for plants cleaning air, and in the monsoon every pot tray is a mosquito risk.

    Trends,
  • Contemporary Indian house design: six moves rooted in local practice

    Six moves make a house look contemporary and work in India: a jaali screen, a verandah or deep chhajja, a courtyard or light well, brick left visible, openings set for cross-ventilation, and a raised plinth. Each is an old local answer to sun, rain or privacy, redrawn in today's materials.

    Design and styles,
  • IGBC and GRIHA green building ratings: levels, fees, Bengal FAR bonus

    IGBC rates homes, schools and hospitals in four levels from Certified to Platinum, at 50 to 100 points for homes. GRIHA gives one to five stars from 25 points. In West Bengal a green-rated building can get 10 per cent extra FAR, but only at IGBC Gold, GRIHA four stars or LEED Gold or higher.

    Materials and climate,

All articlesMore in materials and climate